Omladinskih radnih brigada, Novi Grad: Published notice history
These records show what providers published for this street. A publication is not a count of confirmed outages, and an old planned period is not evidence of today's service.
History is limited to records retained by this service. It may not include every event or the full publication archive of a provider.
Latest collection cycle: 2 November 2026 at 12:53.
Source checks and publication evidence
Website sources are checked on a five-minute schedule. Facebook has separate per-page check times. A successful collection is not confirmation of service at an address.
- KJKP ViK: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- EPBiH: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Toplane Sarajevo: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Sarajevogas: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- BAGS Energotehnika: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- BH Telecom: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- KJKP RAD: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- FHMZ, kvalitet zraka: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Logosoft: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Telemach BiH: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- HT Eronet: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Vodostan Ilijaš: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Komunalac Hadžići, objave Općine: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- GRAS: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Centrotrans: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- BIHAMK, gradske ceste: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Ministarstvo saobraćaja KS: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
- Civilna zaštita KS: Check succeeded. Last attempt: 2 November 2026 at 12:53. Last successful check: 2 November 2026 at 12:53.
KJKP ViK (Facebook source): 2 November 2026 at 12:16.
Toplane Sarajevo (Facebook source): 2 November 2026 at 12:17.
Sarajevogas (Facebook source): 2 November 2026 at 12:17.
KJKP RAD (Facebook source): 2 November 2026 at 12:18.
BH Telecom (Facebook source): 2 November 2026 at 12:19.
Current announced periods
No matching published notices are available.
This does not confirm normal service. An unannounced fault or incomplete source check may still affect an address.
Published notice history
Showing 1 until 2 of 2; Page 1 of 1.
Water supply: Planned work notice
- Announced date
- 23 October 2026
- Announced validity
- Exact time window not confirmed
Locations named by the source: 24
- Novi Rezervoar
- Vogošćanskih odreda
- Alipašina
- Husrefa Redžića
- Antuna Hangije
- Hasana Sušića
- Ferhadija
- Zmaja od Bosne
- Bulevar Meše Selimović
- Teheranski trg
- Dola
- Hadžisulejmanova
- Džinina
- Bistrički put
- Rukodol
- Mekote
- Vlakovo
- Hendekuša
- Orahov brijeg
- Put Famosa
- Stara pruga
- Smaila Šikala
- Omladinskih radnih brigada
- Aleja Bosne Srebrene
The stated period has elapsed. The provider has not thereby confirmed restoration.
Original notice, Bosnian · Published: 23 October 2026 at 08:14
Water supply: Planned work notice
- Announced date
- 23 October 2026
- Announced validity
- Exact time window not confirmed
Locations named by the source: 24
- Novi Rezervoar
- Vogošćanskih odreda
- Alipašina
- Husrefa Redžića
- Antuna Hangije
- Hasana Sušića
- Ferhadija
- Zmaja od Bosne
- Bulevar Meše Selimović
- Teheranski trg
- Dola
- Hadžisulejmanova
- Džinina
- Bistrički put
- Rukodol
- Mekote
- Vlakovo
- Hendekuša
- Orahov brijeg
- Put Famosa
- Stara pruga
- Smaila Šikala
- Omladinskih radnih brigada
- Aleja Bosne Srebrene
The stated period has elapsed. The provider has not thereby confirmed restoration.
Original notice, Bosnian · Published: 23 October 2026 at 08:13 · Facebook page checked: 2 November 2026 at 12:16