Redukcije Sarajevo

Rudolfa Rude Tomića, Novi Grad: Published notice history

These records show what providers published for this street. A publication is not a count of confirmed outages, and an old planned period is not evidence of today's service.

History is limited to records retained by this service. It may not include every event or the full publication archive of a provider.

Latest collection cycle: 2 November 2026 at 16:56.

Source checks and publication evidence

Website sources are checked on a five-minute schedule. Facebook has separate per-page check times. A successful collection is not confirmation of service at an address.

  • KJKP ViK: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • EPBiH: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Toplane Sarajevo: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Sarajevogas: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • BAGS Energotehnika: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • BH Telecom: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • KJKP RAD: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • FHMZ, kvalitet zraka: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Logosoft: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Telemach BiH: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • HT Eronet: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Vodostan Ilijaš: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Komunalac Hadžići, objave Općine: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • GRAS: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Centrotrans: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • BIHAMK, gradske ceste: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Ministarstvo saobraćaja KS: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.
  • Civilna zaštita KS: Check succeeded. Last attempt: 2 November 2026 at 16:56. Last successful check: 2 November 2026 at 16:56.

KJKP ViK (Facebook source): 2 November 2026 at 16:16.

Toplane Sarajevo (Facebook source): 2 November 2026 at 16:17.

Sarajevogas (Facebook source): 2 November 2026 at 16:17.

KJKP RAD (Facebook source): 2 November 2026 at 16:18.

BH Telecom (Facebook source): 2 November 2026 at 16:19.

Current announced periods

Within the announced periodKJKP ViK

Water supply: Planned work notice

Announced date
2 November 2026
Announced validity
Exact time window not confirmed
Locations named by the source: 21
  • Mratnjevače
  • Jahijela Fincija
  • Bosanskih Gazija
  • Džamijska
  • Zmaja od Bosne
  • Rudolfa Rude Tomića
  • Mehmeda Handžića
  • Gornja Breka
  • Tuzlanska
  • Tuzlanska čikma
  • Radnička
  • 10.maj
  • Milinkladska
  • Mice Todorović
  • Muhidina Čomage
  • Pogledine
  • Garaplina
  • Timurhanova
  • Dobrinjska
  • Orahov Brijeg
  • Gatačka

This summary shows the dates and locations stated in the notice. It does not add addresses or confirm restoration.

Original notice, Bosnian · Published: 2 November 2026 at 09:15

Published notice history

Showing 1 until 2 of 2; Page 1 of 1.

Within the announced periodKJKP ViK

Water supply: Planned work notice

Announced date
2 November 2026
Announced validity
Exact time window not confirmed
Locations named by the source: 21
  • Mratnjevače
  • Jahijela Fincija
  • Bosanskih Gazija
  • Džamijska
  • Zmaja od Bosne
  • Rudolfa Rude Tomića
  • Mehmeda Handžića
  • Gornja Breka
  • Tuzlanska
  • Tuzlanska čikma
  • Radnička
  • 10.maj
  • Milinkladska
  • Mice Todorović
  • Muhidina Čomage
  • Pogledine
  • Garaplina
  • Timurhanova
  • Dobrinjska
  • Orahov Brijeg
  • Gatačka

This summary shows the dates and locations stated in the notice. It does not add addresses or confirm restoration.

Original notice, Bosnian · Published: 2 November 2026 at 09:15

Within the announced periodKJKP ViK · Facebook

Water supply: Planned work notice

Announced date
2 November 2026
Announced validity
Exact time window not confirmed
Locations named by the source: 21
  • Mratnjevače
  • Jahijela Fincija
  • Bosanskih Gazija
  • Džamijska
  • Zmaja od Bosne
  • Rudolfa Rude Tomića
  • Mehmeda Handžića
  • Gornja Breka
  • Tuzlanska
  • Tuzlanska čikma
  • Radnička
  • 10.maj
  • Milinkladska
  • Mice Todorović
  • Muhidina Čomage
  • Pogledine
  • Garaplina
  • Timurhanova
  • Dobrinjska
  • Orahov Brijeg
  • Gatačka

This summary shows the dates and locations stated in the notice. It does not add addresses or confirm restoration.

Original notice, Bosnian · Published: 2 November 2026 at 08:14 · Facebook page checked: 2 November 2026 at 16:16